Briggs Engineering & Testing provided Owners Quality Assurance, Construction Inspection and Materials Testing Services as a consultant to MCCA.

The BCEC is today one of the most dramatically airy, user friendly and technologically advanced meeting facilities in the world. At 1.7 million square feet, the $850 million structure is currently one of the largest buildings in New England. Briggs Engineering & Testing performed all of the construction inspection and testing services. Inspection of the piles installation, soils, concrete, structural steel, fireproofing, waterproofing, masonry, roofing, curtain walls, and bituminous concrete was included. Briggs also performed various plant/fabrication inspections.

Project details
  • Project Owner:Massachusetts Convention Center Authority (MCCA)
  • Location:South Boston, MA
  • Type:New Vertical