General Dynamics Electric Boat Facility Upgrades
In November of 2020. The U.S. Navy announced that General Dynamics Electric Boat Corporation was awarded a contract modification for the design and support.
![](https://briggsengineering.com/wp-content/uploads/2021/05/Omni-Hotel-Seaport-District-Boston-Development-The-Davis-Companies-Massport-Summer-Street-Boston-Convention-Exhibition-Center-300x224.jpg)
Omni Hotel Project
Omni Hotel at the Seaport Omni Boston Hotel at the Seaport 370-430 Summer Street, Seaport District, Boston, MA Briggs E&T will be providing comprehensive testing and inspection
![](https://briggsengineering.com/wp-content/uploads/2021/05/grg-300x183.png)
Osgood- BOS3 – AMAZON Fulfillment Center Facility
Hillwood Development has acquired over 100 acres of the Osgood Landing industrial facility in North Andover to construct a 3,800,000 square foot state-of-the-art logistics facility for Amazon.
![](https://briggsengineering.com/wp-content/uploads/2021/05/150SeaportFromWaterHero.0-1-300x200.jpg)
The St. Regis Residences
Cronin Development, developer of the long-anticipated 150 Seaport Boulevard (St. Regis Residences) in Boston’s booming Seaport neighborhood, has announced that the new 22 story luxury tower will be home to the first-ever St. Regis branded luxury residences in Boston.
![](https://briggsengineering.com/wp-content/uploads/2021/05/fffffffffff-300x225.png)
Parcel 12 Project
In August 2020, construction began on Samuels & Associates $350M, Parcel 12 project. Construction began over the Mass Pike (1-90) and Worcester Line Commuter Rail tracks